Timesheet Integration with SAP: Configuration Guide 2026
Complete technical guide to integrate your timesheet software with SAP. SAP configuration, data mapping, synchronization and best practices for IT services firms.
Integrating your timesheet software with SAP lets you automatically synchronize projects, clients and worked time data between the two systems. This complete technical guide walks you through configuring this integration in 2026.
Why Integrate Timesheet with SAP?
Integration Benefits
With a successful integration:
- ✅ Automatic synchronization: Projects (WBS) and hours (CATS) up to date in both systems
- ✅ No double entry: Data shared between timesheet and SAP
- ✅ Financial consistency: Worked time directly in SAP for billing
- ✅ Unified reporting: Combined SAP + timesheet analytics
- ✅ Compliance: Respect for established SAP processes
Time saved: 8-15h/week on manual entry in SAP
SAP Integration Architecture
SAP Modules Involved
Main modules:
-
PS (Project System)
- WBS Elements (Work Breakdown Structure) = Projects
- Network Activities = Project tasks
- Project Structures = Project structure
-
CATS (Cross Application Time Sheet)
- Time Entries = Hours worked
- Absences = Leave and absences
- Time Recording = Time entry
-
HR (Human Resources)
- Employees (PA0001) = Consultants
- Organizational Units = Organizational structures
-
FI (Financial Accounting)
- Customers (KNA1) = Clients
- Billing = Invoicing
Data Flow
Timesheet SAP
│ │
├─ Projects ────────────────> WBS Elements (PS)
├─ Clients ─────────────────> Customers (KNA1)
├─ Hours worked ────────────> CATS Records
├─ Consultants ─────────────> Employees (PA0001)
└─ Billing ─────────────────> Billing Documents (FI)
Integration Methods
1. OData Services (Recommended)
- Modern REST API
- SAP Gateway standard
- Easy to use
- Complete documentation
2. RFC (Remote Function Call)
- Traditional method
- More complex
- Requires ABAP development
- High performance
3. IDoc (Intermediate Document)
- For large volumes
- Asynchronous
- More complex to configure
Prerequisites and Preparation
SAP Prerequisites
Required access:
- SAP administrator access or user with API permissions
- Access to SAP Gateway (for OData)
- Access to transactions: CJ20N (Project Builder), CAT2 (Time Entry), SEGW (Gateway Service Builder), SE37 (if RFC)
- Permissions on modules: PS, CATS, HR, FI
SAP objects to use:
- WBS Elements: For projects
- Customers (KNA1): For clients
- CATS Records: For hours worked
- Employees (PA0001): For consultants
Timesheet Prerequisites
Required features:
- REST API available
- SAP integration support (OData or RFC)
- Data export (Projects, Clients, Timesheets)
- Customizable mapping
Step 1: SAP Configuration (OData Service)
Option A: Use Existing OData Service
1. Check Available Services
- Log in to SAP
- Go to SAP Gateway → Service Catalog
- Search for available services: Z_PROJECT_SRV (if custom), CATS_SRV (Time Entry), PROJECT_SRV (Projects)
2. Activate Service
- Select the service
- Click Activate
- Note the service URL (e.g.
/sap/opu/odata/sap/Z_PROJECT_SRV/)
Option B: Create Custom OData Service
1. Create Service in SEGW
- Transaction
SEGW(Gateway Service Builder) - Create new service project
- Name:
Z_TIMESHEET_SRV
2. Create Entity Sets
Entity Set 1: Projects (WBS)
Entity Set: Projects
Entity Type: Project
Properties: WBS_ELEMENT, PROJECT_DESC, START_DATE, END_DATE, STATUS
Entity Set 2: TimeEntries (CATS)
Entity Set: TimeEntries
Entity Type: TimeEntry
Properties: EMPLOYEE, WBS_ELEMENT, DATE, HOURS, DESCRIPTION, BILLABLE
3. Implement Methods
- Create GET_ENTITYSET methods to read data
- Create CREATE_ENTITY to create data
- Create UPDATE_ENTITY to update
4. Activate and Test
- Activate the service
- Test with Postman or browser
- URL:
https://your-sap-server:port/sap/opu/odata/sap/Z_TIMESHEET_SRV/
Step 2: API Configuration in Timesheet
Base Configuration
1. Access Integration Settings
- Log in to your timesheet software
- Go to Settings → Integrations
- Select SAP
2. OData Configuration
Fill in:
SAP Gateway URL: https://your-sap-server:port/sap/opu/odata/sap/Z_TIMESHEET_SRV/
Username: [Your SAP user]
Password: [Your SAP password]
Service Name: Z_TIMESHEET_SRV
3. Test Connection
- Click Test Connection
- Verify connection succeeds
- If error, check credentials, service URL, user permissions, network
Step 3: SAP Data Mapping
Mapping Projects → WBS Elements
WBS structure in SAP:
WBS Element Format: YYYY-XXXX-XXX
Example: 2026-PROJ-001
From Timesheet:
- Project Name → WBS Description
- Project Code → WBS Element
- Client → Customer (via relation)
- Start Date → Basic Start Date
- End Date → Basic Finish Date
- Budget → Planned Costs
- Status → Project Status
Mapping Hours Worked → CATS
From Timesheet:
- Consultant → PERNR (Personnel Number)
- Project → PROJN (WBS Element)
- Date → CATS_DATE
- Hours → CATSHOURS
- Description → DESCRIPTION
- Billable → AWART (Type: '0010' = Billable, '0020' = Non-billable)
Time type mapping (AWART):
Timesheet Type → SAP AWART
──────────────────────────────────────
Billable Hours → 0010
Non-Billable Hours → 0020
Training → 0030
Administrative → 0040
Sick Leave → 2001
Vacation → 2002
Step 4: Initial Synchronization
Export from Timesheet
1. Prepare Export
- Go to Settings → Integrations → SAP → Sync
- Select Initial Sync
- Choose data: Projects (WBS), Clients (Customers), Consultants (Employees), Timesheets (CATS) - optional for history
2. Run Sync
- Click Start Sync
- Follow progress
- Check logs for errors
3. Verify in SAP
- Transaction
CJ20N(Project Builder) for WBS - Transaction
CAT2(Time Entry) for CATS - Verify data (description, dates, hours)
4. Fix Errors
Common errors: Invalid WBS format, PERNR not found, Invalid AWART, Invalid dates.
Step 5: Automatic Synchronization
Scheduled Sync
Options:
- Real-time: Via webhooks (if supported by SAP)
- Hourly: Via SAP job
- Daily: Via SAP job (night)
- Weekly: Via SAP job (Sunday)
Create SAP Job (SM36):
- Transaction
SM36(Job Scheduling) - Create job: Z_TIMESHEET_SYNC
- Set start date, time, periodic, frequency
Step 6: Tests and Validation
Functional Tests
1. Create project in timesheet → Verify WBS in SAP (CJ20N) 2. Update project in timesheet → Verify WBS updated in SAP 3. Enter hours in timesheet → Verify CATS records in SAP (CAT2) 4. Create WBS in SAP → Verify project in timesheet
Step 7: Best Practices
1. Identifiers: Use external IDs for matching, avoid duplicates 2. Security: Use dedicated SAP users, limit permissions, HTTPS, audit trail 3. Performance: Sync in batches, optimize OData queries, cache static data 4. Errors: Log errors, notify on critical errors, automatic retries
Troubleshooting
Authentication Error
Verify credentials, user permissions (PS, CATS), network, test with SAP GUI.
WBS Not Created
Verify WBS format, PS permissions, project template in SAP, mandatory fields, logs (SM21).
CATS Not Created
Verify PERNR exists, WBS exists and is active, valid AWART, dates in open period, CATS permissions.
Slow Sync
Reduce frequency, sync in smaller batches (100-500), optimize OData, use RFC for large volumes, increase timeouts.
Conclusion
Integrating your timesheet software with SAP lets you automatically synchronize projects (WBS), clients and time data (CATS), eliminating double entry and improving data consistency.
Key takeaways:
- ✅ Preparation: Verify SAP prerequisites and prepare data
- ✅ Configuration: Create OData service or configure RFC
- ✅ Mapping: Define mappings (WBS, CATS, Customers) clearly
- ✅ Testing: Test thoroughly before production
- ✅ Monitoring: Monitor and optimize continuously
Setup time: 8-16 hours (depending on complexity)
ROI: 8-15h/week saved = 400-750h/year = €20,000 - €37,500/year
Need help with your integration?
- 📖 Guide: Timesheet Integration with Salesforce
- 💬 Contact our team for personalized support
- 🚀 Try TimeTrack free with SAP integration available
Related articles:
💡 En savoir plus
Découvrez comment TimeTrack peut vous aider à optimiser votre gestion de temps.
Essayer gratuitement pendant 14 joursPartager cet article
Partagez cet article avec votre réseau
Articles similaires
Voir tous les articlesTimesheet Integration with Salesforce: Complete Guide 2026
Complete technical guide to integrate your timesheet software with Salesforce. Detailed steps, API configuration, data synchronization and best practices.
Complete Guide: Digital Transformation for IT Services Companies in 2026
Complete guide on digital transformation for IT services companies: strategy, tools, processes and adoption. Learn how to digitalize your company effectively to improve productivity and profitability.
Timesheet Migration: How to Switch Solutions Without Losing Data
Complete guide to migrate your timesheet software without losing data. Detailed steps, checklist, best practices and pitfalls to avoid for a successful migration in 2026.